Bulk Sync
Power Automate Solution
netDocShare Sync
Solution Import & Configuration Guide
Importing the solution into a Microsoft 365 / Power Platform tenant.
The Bulk Sync Power Automate Solution has been successfully exported as an unmanaged solution and can be imported into the target Microsoft 365 tenant using the Power Platform solution import process.
This guide walks you through the prerequisites, import steps, post-import configuration, and the licensing requirements needed to run the solution successfully.
What this guide covers
Everything from preparing your environment to verifying that the imported flow runs end to end. Work through the sections in order, then use the Validation Checklist to confirm everything is in place.
Before importing the solution, ensure that the following requirements are met.
Note: If a Dataverse database is not available, it can be set up during the import process.
The user performing the import should have sufficient Power Platform permissions — preferably one of the following roles:
The target SharePoint environment should contain the SharePoint site and list(s) referenced by the flow. For example:
|
Site URL |
https://xyz.sharepoint.com |
|
List Name |
PA-SavedSearch-Control |
Adjust these values to match your own environment.
The importing user must be able to create and authorize the following connections:
Follow these four steps to import the solution into your target environment.
Step 1 — Open Power Apps
Step 2 — Open Solutions
Step 4 — Complete the import
After the solution has been imported, configure the flow as follows:
During validation, Microsoft reported the following warning:
The flow contains an HTTP connector, which Microsoft classifies as a Premium connector. As a result, the flow owner or service account must hold one of the following:
Without a Premium license:
After configuration, verify each of the following items before considering the deployment complete.
|
Verification Item |
|
Solution imported successfully |
|
SharePoint connection created |
|
Office 365 Users connection created |
|
SharePoint site URL updated |
|
SharePoint list configured |
|
Flow saved successfully |
|
Flow activated successfully |
|
Premium license assigned (if HTTP connector is used) |
|
Test execution completed successfully |